L s 212 parapet termination 2 coping stone.
Roof edge termination.
L s 221 mid parapet termination 1 reglet.
Allow to flash off.
The 12 inch gravel stop sections were cut at random which allowed the tests.
Apply a 3 8 wide bead of waterstop 1 2 below roof deck or nailer.
Fold membrane back and apply bonding adhesive to the clean substrate and to the back of the membrane.
The edge termination procedure is the same as above.
Form a 1 2 minimum radius apply termination tape remove the release paper from the tape fold the rubber over the edge press the rubber firmly into the tape apply caulk to the back of a drip edge termination bar and screw the termination bars through the rubber and tape and into the spacer block.
L s 201 roof edge termination 1 edge system.
L s 202 roof edge termination 2 gutter.
Soprema counter flashing is designed to provide a watertight termination at the leading edge of the roofing material.
Position membrane to extend over roof edge and down vertical substrate to 1 below roof deck or nailer.
The extruded aluminum resists rust and has eight bearing points to hold rubber in place.
Soprema counter flashings are manufactured in 12 foot lengths with pre punched notched holes for quicker installation.
K formed aluminum gravel stop was attached to a pressure treated s p f roof edge mock up utilizing a 0 042 thick reinforced tpo roofing membrane.
Roof edge termination of ballasted or mechanically attached roofing membrane systems.
L s 203 roof edge termination 3 gravel stop or drainage bar.
File name size date.