If you use the lines as guides for installing shingles measure up from the drip edge to confirm that you stay parallel.
Roof felt nailing pattern.
Contact roofhelp 9 18 nailing pattern for roofing felt each row of nails that are 18 on center should be approximately 12 from the outside edge of the roll.
From behind the roll reach over and nail down the top of the strip with roofing nails spaced 6 to 8 inches apart.
Snap a chalkline 32 inches above the top edge of the wsu or use the lines on the felt as guides.
Nail the middle and bottom of the felt similarly.
This way i don t get chewed out by the building inspector when they show up to inspect that particular.
I like to give them a call about any new nailing schedules that i m uncertain about.
Be sure that there are no wrinkles.
Fasten drip edge on eaves with galvanized nails and a hammer about 12 inches apart before laying roof felt.
Defer putting drip edge on angled gable ends until after the felt is laid so the metal.
This video walks through the very basic steps for installing tarpaper felt.
Overlap felt courses at least 4 inches.
Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.
Pay careful attention to roll the felt out smoothly avoiding wrinkles as you move across the roof.
Roll out the felt eliminating creases or bubbles and drive at least three staples every foot.
Roll out the felt toward the other end of the roof.
Setting the roll and then nailing off.
Pull straighten and align the felt along the eaves.
The top edge of the felt should be nailed no less than every eight inches.