Rising along the underside of the angled purlin until it reaches a gap then rising up to the next purlin and so on to exit at the ridge or gable.
Roof purlin air gap.
Placing batts between purlins is probably not a top twenty best answer for several reasons.
Fasten the purlin with 16d common nails into each vertical rafter.
But a purlin is applied directly onto the roof rafters running perpendicular between them while a batten is nailed to roof sheathing or applied over an existing roof for installation of a new roof.
Ventilation air follows exactly the opposite path.
Load tables specifying safe loads for different spans are available from metal deck manufacturers.
The map at right which is based on table r806 4 of the irc lists the minimum r values required to prevent condensation in unvented assemblies in various climate zones.
The spacing of purlins on roofs and girts on wall is usually 4 to 6 ft.
Numbers 20 and 22 u s.
The photo above shows battens at a tile roof installation in progress.
The air gap that battens create between the roof sheathing.
An unvented roof assembly is possible only if you keep the roof sheathing warm enough to prevent conditioned air from condensing against it.
If you do not completely fill purlin cavities code requires airflow from eave to ridge over top of the insulation.
As the metal roof heats up in the summer time the added air gap in between will act as a buffer instead of the the metal heating up the below shingle roof.
Purlins at a 45 degree angle still provide sufficient support for installation of the metal roof panels.
Standard gage are generally used for roofing.
Insert two equally spaced nails into the rafter.