But if you snap it at 40 inches then the sheathing will not project over the subfascia or true fascia.
Roof sheathing flush with fascia.
When sheathing a roof the first step is to snap a line so that the first row goes on straight.
Flush soffit panels line up together for a modern minimalist look.
Run fascia the thickness of the plywood higher than the fly rafter on the gable and flush on the sub fascia.
Since joists will be spaced on 16 or 24 inch centers 8 foot pieces of fascia work well.
On the front of the roof edges the original roof deck sheathing was cut back flush with the wall and the fully adhered membrane folded down around the rafter tails to catch the wall water control layer and air control layer.
Flush soffit concealed fasteners.
Osb is lightweight relatively inexpensive and strong enough to resist bending or breaking should someone walk on the roof.
Roof sheathing or decking is one of those elements.
The drip edge will be installed 1 8 proud of away or out from the furring strip in best practice or may be installed tight against the furring strip reduces the life of the furring strip by rot.
If the drip edge is laid right up against the fascia or rafters then because of surface tension the water runs right up against the fascia and underneath the soffit.
Chalk your line up the rake 48 from the point where fascia meets sub fascia.
Go back and check out photograph 10.
This soffit option will exceed your expectations when it comes to strength and aesthetics.
Flush soffit works well as a subtle interior panel wall panel and as part of a roof venting system.
View flush soffit panel.
In the u s roof sheathing is almost always composed of wood usually osb oriented strand board or plywood.
The drip edge should be installed over a piece of 1 2 furring strip so that it stands off from the fascia or rafter tails.
Step 2 hold your first piece in place starting flush at one corner with the top edge of the board pushed tight against the bottom edge of the roof deck or flush with the tops of the joists.